Project Overview

This project involved the comprehensive design, supply, installation, testing, and commissioning of a dedicated firefighting system for a 110 MW HFO Based Power Plant owned by Acorn Infrastructure Services Ltd. The objective was to implement a robust fire safety infrastructure, focusing on a high-capacity manual firefighting network to ensure the safety of critical assets and personnel.

  • Share:
images

Execution Work:

We, Energyshield Engineering Ltd., successfully completed the Design, Supply, Installation, Testing & Commissioning of the Fire Protection System at Acorn Infrastructure Services Ltd. (Phase-specific Solution), including the following system:

  • Fire Protection (Hydrant) System: Full installation of the external and internal fire hydrant network, including ring mains, high-pressure piping, landing valves, and fully equipped fire hose cabinets.

Note: This project specifically covers the comprehensive Fire Hydrant System; it does not include an automatic sprinkler system.

Standards Followed during execution of the works: NFPA 14 (Standard for the Installation of Standpipe and Hose Systems), NFPA 20 (Standard for the Installation of Stationary Pumps for Fire Protection), and BNBC (Bangladesh National Building Code) standards.

We have found Energyshield as a very professional company. Because, In our project, Energyshield did complete so many works (Fire Protection System, Fire Detection System, Gas Suppression System, Foam System etc) within a short time frame. In a word, they are one of the best companies in their business sector.

Engr.Pijush Talukdar

Deputy Project Manager

Project Highlights

  • Project Name:

    ACRON Infrastructure Services Ltd. (Unit-II)

  • Location:

    Chittagong, Bangladesh

  • Client Name:

    Acron Infrastructure Services Ltd

  • Project Year:

    2020-2021