ISO 9001:2015 CERTIFIED
This project involved the comprehensive design, supply, installation, testing, and commissioning of a dedicated firefighting system for a 110 MW HFO Based Power Plant owned by Acorn Infrastructure Services Ltd. The objective was to implement a robust fire safety infrastructure, focusing on a high-capacity manual firefighting network to ensure the safety of critical assets and personnel.
Execution Work:
We, Energyshield Engineering Ltd., successfully completed the Design, Supply, Installation, Testing & Commissioning of the Fire Protection System at Acorn Infrastructure Services Ltd. (Phase-specific Solution), including the following system:
Note: This project specifically covers the comprehensive Fire Hydrant System; it does not include an automatic sprinkler system.
Standards Followed during execution of the works: NFPA 14 (Standard for the Installation of Standpipe and Hose Systems), NFPA 20 (Standard for the Installation of Stationary Pumps for Fire Protection), and BNBC (Bangladesh National Building Code) standards.
Client Feedback
ACRON Infrastructure Services Ltd. (Unit-II)
Chittagong, Bangladesh
2020-2021